I order my BL with BL package,+tow,360+, and cargo mng on 3/5. I'm scheduled for 6/14 production. A previous post thought maybe the size of the dealer caused some changes in delivery. I'm not sure, what it is but it sure isn't when ordered and what you ordered.Ordered BL fully loaded, BL package, moonroof, tow, 360+ on 3/24. Original build date 5/17 moved to 5/31. Called support number just now and guy said prod. date moved to 6/2. I don't have a good feeling with that date after reading through these jumps to July production dates. Fingers crossed.
Sponsored