I ordered 12/21. Production 2/28. Thinking a new production date will be 3/28....? I just need my BS OB by mid May. If I don't get it in time, I don't know what I will decide to do...Our dealer is telling people 6 months from order to delivery. Weather that’s still true 6 months from now who knows. ?‍
It had been literally fluid. Depends on trim/options selected, "chip" shortages, lost shipping container, potential recalls, weather, worker/driver shortages.What is the wait time for a new order? Iv been told 3-5 months up to 13 months.
This is a perfect example of why it’s hard to pin down an accurate estimation.It had been literally fluid. Depends on trim/options selected, "chip" shortages, lost shipping container, potential recalls, weather, worker/driver shortages.
Just as an example, I ordered 10/9/21, production 12/22/21, built 12/23/21, shipped 12/28/21, at dealer in NE FL 1/28/22. My originally scheduled build week was 12/6, it was slipped to 12/20. Mine is OB with only Tow & cargo pad. My time line also includes at least one, maybe two days the factory was shut down due to "material" shortages.
Same boat here 10/20 on mine order confirmed was my last communication.Ordered a Badlands 10/12 - still no build date. Just ordered a Grand Cherokee Altitude - whichever shows up first wins.
Same boat. Actively looking for a RAV4 Hybrid as well as the Bronco Sport. If I can get into a Toyota in the next month then we can see if we like it until the BS is ready.Ordered a Badlands 10/12 - still no build date. Just ordered a Grand Cherokee Altitude - whichever shows up first wins.
We ordered 01/10 and received a “scheduled for production” email from Ford on 01/20 including VIN.Ordered mine 1/31, no update yet on production. How long does the VIN take to be made for tracking? Was told by dealership things are looking better and all around order should be 3-4 months?
I'm curious about what your priority code(number) was on you order confirmation (my sales rep texted me a picture of his paper version of my order confirmation, on which there was a box with a number which is the priority code). Do you happen to know and care to share what that was? Seems like it was scheduled for production quite fast. And lucky you!We ordered 01/10 and received a “scheduled for production” email from Ford on 01/20 including VIN.
It was 19 on the original paperwork, which I believe is the lowest/worst you can get. The original production date was 02/21, then a few weeks ago, was moved to 02/28. So far, no further pushbacks but I wouldn’t be surprised if it got pushed again. For reference, the OBX has tech package, tow package but we did not get 360+. Our dealer said that was a good move because they have seen that option move slower. Who knows though. From what I’ve read on here, which is a lot, I’m not sure the rhyme or reason for timing is all that straight forward. I’ve tried to make sense of it myself!I'm curious about what your priority code(number) was on you order confirmation (my sales rep texted me a picture of his paper version of my order confirmation, on which there was a box with a number which is the priority code). Do you happen to know and care to share what that was? Seems like it was scheduled for production quite fast. And lucky you!
Thanks for sharing. Mine was also 19, and I also saw that was the lowest we'd get as custom orders. The dealer inventory/stock orders have lower codes than us (20-40 I think is what I learned on another forum), so at least we're slightly better off there. Yeah, I won't drive myself crazy trying to figure it out, I'll just drive myself crazy actually waiting to get it. You must also have a high priority dealership, which I've gathered Ford prioritizes some over others, but perhaps that's reflected in the priority code... IDK. My BS will be the Big Bend, but it's gonna have the convenience package (the BB version of OB's tech package), moonroof, tow pkg, and 360+, just about as fully loaded as the BB's can come. The only "tech-y" options I didn't order was the remote start or the engine block heater. And from I've read (like you, a lot on here haha), the things I picked could really slow it down. I think the moonroof and the 360+ will be the really big kickers. I really wanted the navigation with the 360+, and figured the adaptive cruise control would be a nice feature as well. I don't think mine will be ready anytime soon. I'm thinking it will be at least until June - July. I'm trying to be conservative mostly so that if it happens to be ready in May or April, I'll be happy! Hopefully it won't be longer than mid-summer. Time will tell. My eyes are practically glued to my email and phone waiting for a VIN and production schedule...It was 19 on the original paperwork, which I believe is the lowest/worst you can get. The original production date was 02/21, then a few weeks ago, was moved to 02/28. So far, no further pushbacks but I wouldn’t be surprised if it got pushed again. For reference, the OBX has tech package, tow package but we did not get 360+. Our dealer said that was a good move because they have seen that option move slower. Who knows though. From what I’ve read on here, which is a lot, I’m not sure the rhyme or reason for timing is all that straight forward. I’ve tried to make sense of it myself!