Mine just went to 12/24 as well… Ford needs an explanation for this because it’s ridiculous that’s almost 2022. I know chips are the issue but this is insane
Mines been in production since 6/7 it hasn't been listed as built on the tracker but in the Ford Etis program the I looked at the electronics tab and it’s missing the rcm so I’m assuming it’ll be moved to built status once the last chip is installed ? Hopefully
I wonder? If that’s the case my bronco 3/7/21 might be done hopefully it was waiting for the rcm and it does have the recall too but I’m hoping it will update the status in Etis and the tracker soon