New release. If you have not been scheduled yet, you are going to have to wait at least a week to find out. Ford will not be doing any scheduling next week for those that are not currently scheduled.
Sponsored
Yes, the Mavericks are getting the first three build weeks since Ford is scheduling all of the hybrid orders that have been on hold due to the EPA testing that needed to be done. Since the Hermosillo assembly line handles both the Bronco Sports and the Mavericks, scheduling only the Mavericks gives Ford a lot more of them coming off the line in just those three weeks alone. Hopefully then the same is true for the week of 01/24, since there were no Maverick builds scheduled for that week, that all of the Bronco Sport Badlands will be built plus any of the other levels.Someone said in a different thread that the Mavericks are getting the first 3 build weeks of January.
Didn't think that they would be doing ANY scheduling next week due to the Thanksgiving holiday.New release. If you have not been scheduled yet, you are going to have to wait at least a week to find out. Ford will not be doing any scheduling next week for those that are not currently scheduled.
I hope you can get those changes made.I called dealer this morning. I'm at code 01 this morning but no VIN or build date. They're checking to see if tow package can now be added.
They confirmed this evening that it was added. I'll let you know when I get that scheduling email.I hope you can get those changes made.
We ordered 10/28 and have heard nothing yet.
I ordered 10/1 and got an email 10/12 stating a build week of 12/6.Hi , anybody have an order date of around 9/28 and got a build date? I have a BL on order and no build date ( no moon roof) .
This was a second order incase the 2021 never happened , it finally showed up this week but if the 2022 are coming soon I can wait as mine was a Sanorina desert queen and I’m not 100% comfortably with what I have seen so far ( not picked up , they said it was ready but look at the adhesive all over the black paint when they ripped off the white plastic protector sheets)?.
The 2021 is also listed in the dealer inventory too(!) I dont blame them but I did put $1000 down on it!
Thanks that should put me in the dec build schedule then but I did hear color choruses effects dated too…I ordered 10/1 and got an email 10/12 stating a build week of 12/6.
What did you hear about which colors?Thanks that should put me in the dec build schedule then but I did hear color choruses effects dated too…
Hi nothing specific, just what the dealer sales guys were discussing , they also mentioned there is a Xmas plant shutdown?What did you hear about which colors?
The Xmas shutdown is a normal holiday shutdown And with the first three weeks in January being dedicated to the Maverick, there will be no BSs built from Dec 27th until they start “again” the week of Jan 24th (4 weeks) Colors I will have to look intoHi nothing specific, just what the dealer sales guys were discussing , they also mentioned there is a Xmas plant shutdown?
I’m Sure you have much better info than me!
Myself and another family member both ordered the week of 9/20 and have build dates of 11/29 and 12/6. Both are Badlands, mine w/o premium and theirs loaded w/moonroof. Both are Velocity Blue FWIW.Hi , anybody have an order date of around 9/28 and got a build date? I have a BL on order and no build date ( no moon roof) .
My original build week of 12/6 got pushed to 12/13 (sales manager at the dealership just called me yesterday to inform me of this change).I ordered 10/1 and got a build week of 12/6. It’s a BL with premium package, tow package, moonroof, 360+ and cargo management, so I fully expect it to be delayed but no word yet that the build week has changed.
Since my original BL was destroyed in a freeway crash, I figured I can wait to get a new one with everything I want (especially because the insurance payout was enough to cover it). Anything before spring will be a plus on my mind.